Crews Hole Road (main contractor Sharemills Ltd)

This job was approximately 35m of bow-top railings, two gates and one staircase, all galvanized and powder coated. We called in the services of Rob Obee of Line & Level to plot all the levels as the site was on a hill and the railings curved up the hill.  Rob’s levels were then passed onto our draughtsman, Dave of Blue Structures Ltd who used these to produce detailed drawings for us to work to.  Below you can see the GA of the entire project alongside a photo of a section of the railing to show the finish we achieved.  The holes for the railing uprights were diamond drilled by Drillcut Ltd and the posts were set using non-shrink grout.